Table of Contents
ToggleVande Bharat services Ajni (Nagpur)–Pune and Belagavi–Bengaluru launched/flagged off in August 2025. Fast timings, strong connectivity and social buzz make them. Ajni–Pune service will run with fixed timings from 11–12 August; Bengaluru–Belagavi service flagged off from 10 August.
Route 1: Pune ⇄ Ajni (Nagpur) Vande Bharat — step-by-step
When does it run and for how long?
Pune→Ajni (Train 26101): Departure 06:25, Arrival 18:25 (effective 11.08.2025)
Ajni→Pune (Train 26102): Departure 09:50, Arrival 21:50 (effective 12.08.2025)
Average ~12 hours journey, 6 days a week (does not run from Pune on Tuesdays, from Ajni on Mondays).
Main stops (as per timetable):
Wardha, Badnera (Amravati), Akola, Shegaon, Bhusaval, Jalgaon, Manmad, Kopargaon, Ahmednagar, Daund Chord Line.
What to do in between (stay/stopover plan):
Note: Vande Bharat stops are short; cover these places as a “break-journey” or on a separate day.
-
Shegaon: Shri Gajanan Maharaj Temple Darshan.
2. Jalgaon: Gateway to Ajanta Caves (day-trip; further Ch. Sambhajinagar/Manmad connection to Ellora).
3.Manmad/Kopargaon: Easiest rail/road connect for Shirdi Darshan.
4. Ahmednagar: Fort, historical walk; Shaniwar Wada, FC Road food trail after Pune.
Route 2: Belagavi ⇄ Bengaluru Vande Bharat — Step-by-Step
Launch & Timings (One direction lead times):
Belagavi→KSR Bengaluru (Train 26751): Belagavi 05:20 → Dharwad → SSS Hubballi → Haveri → Davanagere → Tumakuru → Yesvantpur → KSR Bengaluru 13:50. Service flagged-off on 10 Aug 2025; Operator South Western Railway.
What to do in between (break-journey/next day):
Belagavi: Gokak Falls (amazing in monsoons), Kittur Fort side-trip.
Dharwad/Hubballi: Nrupatunga Betta; Dharwad peda food-stop.
Davanagere: Benne-dosai breakfast trail.
Tumakuru: Devarayanadurga hikes/temples.
Bengaluru: Cubbon Park, Church Street cafés, Lalbagh.
(With a 5:20 am departure to Belagavi, many passengers said it was “too early”—arrange stay/cab accordingly while planning.)